This document specifies the concepts and basic requirements for the planning of railway operation in order to reduce risk in the event of earthquakes. This excludes regions where the consequences of seismic hazard for railway operation are low or non-existent. The definition of such regions is out of the scope of this document.
NOTE The stages defined for consideration of the countermeasures necessary for the safe management of the seismic hazards can also be relevant for dealing with other natural phenomena.
This document includes only operational measures and excludes any infrastructure measures. Furthermore, this document does not include specific measures which ensure, without fail, passenger safety or which provide protection against railway-operational damage caused by earthquakes. Therefore, residual risk can remain.
Общая информация
-
Текущий статус: ОпубликованоДата публикации: 2020-05Этап: Опубликование международного стандарта [60.60]
-
Версия: 1
-
Технический комитет :ISO/TC 269/SC 3
- RSS обновления
Жизненный цикл
-
Сейчас
-
00
Предварительная стадия
-
10
Стадия, связанная с внесением предложения
-
20
Подготовительная стадия
-
30
Стадия, связанная с подготовкой проекта комитета
-
40
Стадия, связанная с рассмотрением проекта международного стандарта
-
50
Стадия, на которой осуществляется принятие стандарта
-
60
Стадия, на которой осуществляется публикация
-
90
Стадия пересмотра
-
95
Стадия, на которой осуществляется отмена стандарта
-
00