International Standard
IWA 33-3:2021
Technical guidelines for the development of small hydropower plants — Part 3: Design principles and requirements
Reference number
IWA 33-3:2021
Edition 1
2021-03
International Standard
Read sample
p
IWA 33-3:2021
82192
Published (Edition 1, 2021)

IWA 33-3:2021

IWA 33-3:2021
82192
Format
Language
CHF 194
Convert Swiss francs (CHF) to your currency

Abstract

This document specifies the general principles and basic requirements of design for small hydropower (SHP) projects up to 30 MWe, mainly including hydrology, geology, energy calculations, project layout, hydraulics, electromechanical equipment selection, construction planning, project cost estimates, economic appraisal, social and environmental assessments.

Application of this document is intended to be site specific, with the principles and requirements of design applied in accordance with the needs of proposed hydropower plant.

General information

  •  : Published
     : 2021-03
    : International Standard published [60.60]
  •  : 1
     : 80
  • ISO/TC 339
    27.140 
  • RSS updates

Got a question?

Check out our FAQs

Customer care
+41 22 749 08 88

Opening hours:
Monday to Friday - 09:00-12:00, 14:00-17:00 (UTC+1)